ENVIRONMENTAL MANAGEMENT UNIT (WSIP), SIDA

REPORTS

Different Reports Prepared by EMU – WSIP Staff :

EMPs for Community Based Contracts

Team Positions
Sr. Description
1 Bhan EMP
2 Boilo EMP
3 EMP Ashabo
4 EMP Bilalani
5 Kandiaro EMPi
6 Khoski EMP
Other Reports
Team Positions
Sr. Description
1 Walk Through Survey (Barrare Minor Lower Nara Canal)
2 Comments on EMP
3 Comments on RAP
4 Establishment of RA
5 Walk Through Survey (RD - 196 LS Upper Nara Canal)
6 Field Visit of Khoski and Kumbharo Minor
7 Field Visit of Kunri and Darelo Minor
8 Report of Workshop on Analytical Technique in Water and Soil Analysis
9 Report on Socio Economic Design of Nara Canal
10 Report on Public Hearing of EIA Report for Rainee Canal Project
11 Discharge of Manchar Lake water into River Indus